Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23LG0029

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23LG0029","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MATI CITY, PACKAGE 2, DAVAO ORIENTAL","Flood Control and Drainage","On-Going",57321674.89,0,93.31,"Davao Oriental 2nd DEO","Region XI","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2023-03-24",null,2023,"Regular Infra - GAA 2023 OO-2",6.95911,126.2183,"1102509000","1102500000"]
SHA-256
8b86c2162587ac915334daf97db12106f3812cf900c66c7434095edda0091e34

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.