Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23LG0043

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23LG0043","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, MATI CITY, PACKAGE 1, DAVAO ORIENTAL","Flood Control and Drainage","Completed",95535000,0,100,"Davao Oriental 2nd DEO","Region XI","LEGACY CONSTRUCTION CORPORATION (FORMERLY: LEGACY CONSTRUCTION) (22465)","2023-03-24","2024-02-17",2023,"Regular Infra - GAA 2023 OO-2",6.93662,126.25372,"1102509000","1102500000"]
SHA-256
24a502931bb6b679eb156db9efdacdffb3d60dcbaa70296332270b5eb2021104

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.