Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23M00119

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23M00119","CONSTRUCTION OF PULANGI BANK PROTECTION, RIGHT BANK OF TUNGGOL  FLOODWAY, PACKAGE A - PHASE 2, STA. 0+000  STA. 0+071, PAGALUNGAN,      MAGUINDANAO","Flood Control and Drainage","Completed",47646875,0,100,"Region XII","Region XII","LLABAN CONSTRUCTION & SUPPLY (FORMERLY: LLABAN CON (29504)","2023-04-03","2023-09-15",2023,"Regular Infra - GAA 2023 OO-2",7.07812,124.74056,"1908815000","1908800000"]
SHA-256
910cd44fc4131b7f1946d176ead0e3ecfecc725b73f57b35872edbd6e2f95506

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.