Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23MB0122

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23MB0122","CONSTRUCTION OF SILWAY RIVER BOULEVARD, GENERAL SANTOS CITY","Multi Purpose Buildings, Roads","On-Going",95955893.05,0,21.64,"South Cotabato 1st DEO","Region XII","VICENTE T. LAO CONSTRUCTION (7040)","2024-01-10",null,2023,"Regular Infra - GAA 2023 CSSP",6.11476,125.15952,"1230800000","1206300000"]
SHA-256
210838f22be6aeacc85ca0ee35bef05db93d3ff1eed3cc76686bf5538fdf7898

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.