Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23MB0171

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23MB0171","CONSTRUCTION OF 1STY2CL, SILWAY 7 INTEGRATED SCHOOL, POLOMOLOK, SOUTH COTABATO","Buildings and Facilities","Completed",4716378.89,0,100,"South Cotabato 1st DEO","Region XII","VERGUZ CONSTRUCTION (26641)","2023-09-15","2024-06-02",2023,"Outside Infra - GAA 2023 DepEd BEFF",6.17842,125.12099,"1230800000","1206300000"]
SHA-256
4081e00a7c3e3b2cd4c7c4a22f4fdd08ec22eeac4a0c131af2ceb1d3254fbd0f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.