Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23MG0034

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23MG0034","CLUSTER VI-A.CONSTRUCTION OF RIVER BANK PROTECTION ALONG SAFALI RIVER, BRGY. POBLACION, T'BOLI, SOUTH COTABATO B.CONSTRUCTION OF RIVER BANK PROTECTION ALONG BANGA RIVER, BRGY. KIBID, NORALA, SOUTH COTABATO","Flood Control and Drainage","Completed",48994919.46,0,100,"South Cotabato 2nd DEO","Region XII","BETTER WORK CONSTRUCTION (24432)","2023-04-17","2023-08-07",2023,"Regular Infra - GAA 2023 CSSP",6.55093,124.6831,"1206311000","1206300000"]
SHA-256
8c337fc5c0ca3b87bd9b892e22d62f3dc41c37c37c075c51cbac694c6f09667e

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.