Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23N00018

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23N00018","CONSTRUCTION OF SAN ANTONIO FLOOD CONTROL, BARANGAY SAN ANTONIO, MADRID, SURIGAO DEL SUR","Flood Control and Drainage","Completed",109044905.44,0,100,"Region XIII","Region XIII","HAPPY ALL3 BUILDERS CORPORATION (44621) / TRIPARCO DEVELOPMENT CORPORATION (23327)","2023-04-24","2024-07-10",2023,"Regular Infra - GAA 2023 OO-2",9.74139,125.48278,"1606724000","1606700000"]
SHA-256
81bae1b9d6bbd8ed2bf9f3bd76db24fb0a302d337bd7cca79c7122218dab5946

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.