Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23OD0139

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23OD0139","CONSTRUCTION OF FLOOD CONTROL WALL ALONG SAPANG ALAT CREEK, STA. 3+996 TO 4+346, CALOOCAN CITY","Flood Control and Drainage","Completed",93966981.03,0,100,"Metro Manila 3rd DEO","National Capital Region","ELITE GENERAL CONTRACTOR AND DEVELOPMENT CORP. (49128)","2023-04-24","2023-12-26",2023,"Regular Infra - GAA 2023 CSSP",14.77298,121.08052,"1380100000","1307500000"]
SHA-256
aea033b0cc6af51ae82540610e419477bf7104b8b36ed15d69f186a3f1a37d2d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.