Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23OI0028

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23OI0028","CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BALIHATAR CREEK LAS PINAS CITY","Flood Control and Drainage","Completed",48994961.38,0,100,"Las Piñas-Muntinlupa DEO","National Capital Region","E. F. CHUA CONSTRUCTION, INC. (37826)","2023-02-13","2023-08-11",2023,"Regular Infra - GAA 2023 OO-2",14.47796,120.99048,"1380200000","1307600000"]
SHA-256
1cf3bc9a745f05322a33cdd845cb8f43a274e6f8823c3156335cc1a923462fe7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.