Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23PA0019

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23PA0019","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), BAGALAY, TAYUM, A","Flood Control and Drainage","Completed",96499891,0,100,"Abra DEO","Cordillera Administrative Region","MG SAMIDAN CONSTRUCTION (33234)","2023-03-30","2023-06-28",2023,"Regular Infra - GAA 2023 OO-2",17.62818,120.69655,"1400107000","1400100000"]
SHA-256
aa5c6066b241b5461892a18ed6719f39f8116e7d2e116fe4fdd0c38603826ee2

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.