Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23PA0022

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23PA0022","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CABAROAN, TAYUM,","Flood Control and Drainage","Completed",96500000,0,100,"Abra DEO","Cordillera Administrative Region","MG SAMIDAN CONSTRUCTION (33234)","2023-03-30","2023-07-28",2023,"Regular Infra - GAA 2023 OO-2",17.61639,120.65185,"1400124000","1400100000"]
SHA-256
07c157834b981f3776521b201bf76fab3786b208c39dd6a7a94f5caf05475b05

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.