Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23PA0023

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23PA0023","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CABOLOAN, BANGUED","Flood Control and Drainage","On-Going",92454959.86,0,100,"Abra DEO","Cordillera Administrative Region","739 BUILDERS (31174)","2023-04-11",null,2023,"Regular Infra - GAA 2023 OO-2",17.63592,120.66805,"1400107000","1400100000"]
SHA-256
b9d987ae2ceaf4be93662c564992b4ba2b35ce24d6b7c54d1819e91e6a09c896

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.