Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23PA0025

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23PA0025","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA RIVER BASIN (PHASE II), CABAROAN, DANGLAS","Flood Control and Drainage","On-Going",91711208.86,0,97.74,"Abra DEO","Cordillera Administrative Region","MG SAMIDAN CONSTRUCTION (33234)","2023-04-11",null,2023,"Regular Infra - GAA 2023 OO-2",17.68679,120.6633,"1400108000","1400100000"]
SHA-256
b25b52fbd78111eb9daeb56117d79d62a4dcb2d32aed878eef7e43e8b6ecdc7b

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.