Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 23PA0136

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","23PA0136","OO2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVER, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ABRA MAJOR RIVER BASIN, PAGA, CARDONA, DOLORES","Flood Control and Drainage","Completed",96497500,0,100,"Abra DEO","Cordillera Administrative Region","MG SAMIDAN CONSTRUCTION (33234)","2023-06-14","2024-01-10",2023,"Regular Infra - GAA 2023 OO-2",17.6588,120.70578,"1400107000","1400100000"]
SHA-256
5d272044539761421e97719d9c6e41e89c3e07e9daf63e62827e4387fe3c6c58

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.