Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24A00153

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24A00153","CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ARINGAY RIVER, BARANGAY HALOG EAST, TUBAO, LA UNION","Flood Control and Drainage","Completed",144749736.97,0,100,"Region I","Region I","RODEKOM GENERAL CONSTRUCTION AND ENTERPRISE (38656)","2024-03-15","2024-07-26",2024,"Regular Infra - GAA 2024 OO-2",16.36013,120.43559,"103320000","103300000"]
SHA-256
93997a3cfe20fe808b7b21e0e0737b704f2f37b2694b5c88b2e14eb8d99347d6

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.