Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24A00268

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24A00268","SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), CONSTRUCTION OF ROAD CONNECTING SUYO - ALILEM, SUYO, ILOCOS SUR (PHASE 1)","Roads","Completed",43425000,0,100,"Region I","Region I","FIRST NORTHWAY DEVELOPMENT & CONSTRUCTION CORP. (11645)","2024-04-08","2025-02-21",2024,"Regular Infra - GAA 2024 SSP",16.95598,120.5596,"102932000","102900000"]
SHA-256
096efde9573d7e60111a4b17625fac496b480ddfa39c5906c8f59fbf2ab1409a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.