Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24AG0015

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24AG0015","FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALINGCAGUING RIVER (POBLACION WEST SECTION), STA.001+848-STA.002+278, BRGY. POBLACION WEST,AGNO,PANG","Flood Control and Drainage","Completed",96500000,0,100,"Pangasinan 1st DEO","Region I","ALCEL CONSTRUCTION (15129)","2024-02-12","2024-08-27",2024,"Regular Infra - GAA 2024 OO-2",16.12328,119.79165,"105501000","105500000"]
SHA-256
133bf16f59ec818ff74ab0eb5fedfc892639796cc8f2bfcbaaad626d9cf4e9b4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.