Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24AG0023

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24AG0023","FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BALINGCAGUING RIVER (POBLACION SECTION),STA.027+880-STA.028+203, BRGY.POB","Flood Control and Drainage","Completed",72687660,0,100,"Pangasinan 1st DEO","Region I","BERSON'S CONSTRUCTION & TRADING (31181)","2024-02-12","2025-01-20",2024,"Regular Infra - GAA 2024 OO-2",16.06553,119.94168,"105523000","105500000"]
SHA-256
e2ca8fe8406e6153d2fb10fc85b24baf7f69bfe282371f16b8e4cdcb0999d0c9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.