Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24AI0057

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24AI0057","CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG SINUCALAN RIVER, BARANGAY SAN JOSE, URDANETA CITY, PANGASINAN","Flood Control and Drainage","Completed",48143361.81,0,100,"Pangasinan 3rd DEO","Region I","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)","2024-04-19","2024-10-04",2024,"Regular Infra - GAA 2024 OO-2",15.98962,120.49959,"105525000","105500000"]
SHA-256
13177a9da1f65f9cce05c500d324d4d6e16db7be90b3b39d30f626fb0e9d39e1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.