Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24AI0244

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24AI0244","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TAGAMUSING AND ALLIED RIVERS, PACKAGE 1, POZORRUBIO, PANGASINAN","GAA 2024 SSP","Completed",86631574.25,0,100,"Pangasinan 3rd DEO","Region I","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574) / R.G.TABIN CONSTRUCTION AND SUPPLY (26830)","2024-06-07","2024-07-25",2024,"Regular Infra - GAA 2024 SSP",16.09729,120.57925,"105541000","105500000"]
SHA-256
350775132d2d7569adeeac9790f30a7c04931c48e70c0fb3b985984a8aa5b1ae

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.