Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24BG0175

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24BG0175","OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM- CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF PINACANAUAN RIVER FLOOD CONTROL PROJECT, BARANGAY MALUNO,","Flood Control and Drainage","Completed",96489915.19,0,100,"Isabela 3rd DEO","Region II","JWU CONSTRUCTION AND SUPPLY (48659)","2024-07-23","2024-10-15",2024,"Regular Infra - GAA 2024 OO-2",16.9944,121.97234,"203104000","203100000"]
SHA-256
818fa7e364725fe7b2bf917df4e6ce97b366fea471b0b8d8329ad507a7b35221

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.