Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24BG0204

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24BG0204","OO2:PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS-FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ REHAB OF FLOOD MITIGATION FACILITIES W/N MAJOR RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF CAGAYAN RIVER FLOOD CONTROL STRUCTURE, BRGY DAMMAO (PACKAGE 3), G","Flood Control and Drainage","Completed",72325003.61,0,100,"Isabela 3rd DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2024-08-20","2025-05-28",2024,"Regular Infra - GAA 2024 OO-2",17.0794,121.82496,"203113000","203100000"]
SHA-256
387bb34a03fca0bd73638212eb451a1af9003153949c1d099b15d255f5d5157a

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.