Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24BI0009

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24BI0009","002: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS       CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER   BASINS AND PRINCIPAL RIVERS CONSTRUCTION OF FLOOD CONTROL AND DRAINAGE   STRUCTURE (FCDS PACKAGE 3) AL","Flood Control and Drainage","Completed",144750000,0,100,"Nueva Vizcaya DEO","Region II","EGB CONSTRUCTION CORPORATION (FORMERLY: EGB CONSTRUCTION) (13722)","2024-02-16","2025-04-11",2024,"Regular Infra - GAA 2024 OO-2",16.59577,121.26343,"205003000","205000000"]
SHA-256
2df4e6d980cba131ee8322b59e543dec3e8013186a8ff34f6cf5aa9e859707f7

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.