Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24BI0039

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24BI0039","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION   STRUCTURE AND DRAINAGE SYSTEM  CONSTRUCTION OF MANAMTAM FLOOD CONTROL  ALONG MATUNO RIVER (SECTION 2)","Flood Control and Drainage","Completed",49000000,0,100,"Nueva Vizcaya DEO","Region II","DALCON CONSTRUCTION (40601)","2024-02-13","2024-03-27",2024,"Regular Infra - GAA 2024 OO-2",16.39189,121.06489,"205004000","205000000"]
SHA-256
6cf151a0aebcbbf500ba9ca13cc100dd1b412258cac8d096d4e638008a17bff8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.