Project 24C00104

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24C00104","FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS-CONSTRUCTION OF FLOOD CONTROL STRUCTURES ALONG SAN MIGUEL RIVER, RIGHT SIDE, SAN MIGUEL, BULACAN","Flood Control and Drainage","On-Going",47515605.21,0,100,"Region III","Region III","IM CONSTRUCTION CORPORATION (20074)","2024-09-16",null,2024,"Regular Infra - GAA 2024 OO-2",15.14358,120.9468,"301421000","301400000"]