Project 24C00530
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-24C00530",
"title": "BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, PINAMBARAN SECTION (DOWNSTREAM), BRGY. PINAMBARAN, SAN MIGUEL, BULACAN",
"sector": [
"GAA 2024 SSP"
],
"status": "implementation",
"publicAuthority": {
"name": "DPWH Region III"
},
"period": {
"startDate": "2024-07-29"
},
"budget": {
"amount": {
"amount": 39599303.5,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
120.98094,
15.20981
]
}
}
],
"parties": [
{
"name": "ONE FRAME CONSTRUCTION INC. (57070) / TOPNOTCH CATALYST BUILDERS INC.",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "24C00530",
"summary": {
"title": "BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SAN MIGUEL RIVER, PINAMBARAN SECTION (DOWNSTREAM), BRGY. PINAMBARAN, SAN MIGUEL, BULACAN",
"status": "active",
"contractValue": {
"amount": 39599303.5,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "On-Going",
"physicalProgressPercent": 83.39,
"fundingSource": "Regular Infra - GAA 2024 SSP",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "5d36117f4fdbdef2fc68193abed34a33449f1c3c407ddb047f04a1b6869b388a"
}
}