Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CC0056

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CC0056","CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE AT BARANGAY PRITIL (PHASE II), GUIGUINTO, BULACAN","Flood Control and Drainage","Completed",98999571.9,0,100,"Bulacan 1st DEO","Region III","TOPNOTCH CATALYST BUILDERS INC. (34061)","2024-02-07","2024-09-23",2024,"Regular Infra - GAA 2024 SSP",14.85412,120.87305,"301408000","301400000"]
SHA-256
d44e9512fc0e24bdd10b9b61714b6c4083960100ed5027b76c2d1202c319a9db

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.