Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CC0159

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CC0159","REHABILITATION OF UGONG CREEK, GUIGUINTO, BULACAN","Flood Control and Drainage","Completed",49499959.76,0,100,"Bulacan 1st DEO","Region III","A.L. SALAZAR CONSTRUCTION, INC. (3899)","2024-02-28","2024-08-25",2024,"Regular Infra - GAA 2024 SSP",14.82607,120.89664,"301402000","301400000"]
SHA-256
5d92ea21551a13624aacdcbd993a56b1e5bdfffa8070a6a654c7f69f435eaac8

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.