Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CC0165

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CC0165","CONSTRUCTION OF REINFORCED CONCRETE FLOOD CONTROL STRUCTURE ALONG BALAGTAS RIVER, BARANGAY SANTOL (PUROK 1 TO PUROK 3), BALAGTAS, BULACAN","Flood Control and Drainage","Completed",77198851.79,0,100,"Bulacan 1st DEO","Region III","JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)","2024-02-28","2024-06-19",2024,"Regular Infra - GAA 2024 OO-2",14.86028,120.92109,"301415000","301400000"]
SHA-256
6ba924595f19ee3ebcd3639efcbb601b4513d82713de0b211241721963be0025

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.