Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CC0599

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CC0599","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG GUIGUINTO RIVER (TRIBUTARY), PACKAGE G, PUROK 4, BARANGAY BAGONG SILANG, PLARIDEL, BULACAN","Flood Control and Drainage","Completed",96499773.79,0,100,"Bulacan 1st DEO","Region III","TOPNOTCH CATALYST BUILDERS INC. (34061)","2024-12-18","2025-04-02",2024,"Outside Infra - Unprogrammed Appropriations 2024",14.8682,120.88439,"301417000","301400000"]
SHA-256
bee5c9edb90b86d29cb6ca4f96a189720bd8c745d66b6c76fab3eaa6ccb07e47

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.