Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CC0660

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CC0660","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG TABANG RIVER, BARANGAY PITPITAN, BULAKAN, BULACAN","Flood Control and Drainage","Not Yet Started",69742354.58,0,0,"Bulacan 1st DEO","Region III","PTM DEVELOPMENT CORP. (48504)",null,null,2024,"Outside Infra - Unprogrammed Appropriations 2024",14.80936,120.86145,"301405000","301400000"]
SHA-256
66f0d3f06bc72bcdd0e61071430f8d9b3f654b0334d62d2f984000f970d9a5e1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.