FY2026 GAA: ₱6.79T
PisoScan

Project 24CD0002

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CD0002","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MEYCAUAYAN RIVER AND ITS TRIBUTARIES, STA. 03+500 STA. 03+700 (LIPUTAN CONSTANTINO SECTION, RIGHT SIDE), MEYCAUAYAN, BULACAN","Flood Control and Drainage","Completed",67535330.1,0,100,"Bulacan 2nd DEO","Region III","AZUL BUILDERS (21870)","2024-02-14","2024-11-02",2024,"Regular Infra - GAA 2024 OO-2",14.7374,120.92804,"301412000","301400000"]
SHA-256
060a0891acd7a87df653b9f9df0563424239d077d0d88cdad200244ce18679b1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.