Project 24CD0011
DPWH infrastructure contract
This contract as an OC4IDS project record, the infrastructure standard used by OpenGovChain. Download: JSON
{
"id": "oc4ids-pisoscan-dpwh-24CD0011",
"title": "CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES, STA. 09+300 TO STA. 09+500 (BALASING-PULONG BUHANGIN SECTION), SANTA MARIA, BULACAN",
"sector": [
"Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)"
],
"status": "completed",
"publicAuthority": {
"name": "DPWH Bulacan 2nd DEO"
},
"period": {
"startDate": "2024-02-12",
"endDate": "2024-12-11"
},
"budget": {
"amount": {
"amount": 49495385.93,
"currency": "PHP"
}
},
"locations": [
{
"geometry": {
"type": "Point",
"coordinates": [
120.98923,
14.84384
]
}
}
],
"parties": [
{
"name": "C & F CONSTRUCTION AND DEVELOPMENT CORPORATION",
"roles": [
"supplier"
]
}
],
"contractingProcesses": [
{
"id": "24CD0011",
"summary": {
"title": "CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG SANTA MARIA RIVER AND ITS TRIBUTARIES, STA. 09+300 TO STA. 09+500 (BALASING-PULONG BUHANGIN SECTION), SANTA MARIA, BULACAN",
"status": "closed",
"contractValue": {
"amount": 49495385.93,
"currency": "PHP"
}
}
}
],
"pisoscan": {
"dpwhStatus": "Completed",
"physicalProgressPercent": 100,
"fundingSource": "Regular Infra - Flood Control: Construction - Drainage (e.g., Closed and Open Conduits, Spillway), Flood Control: Construction - Slope Protection using Structural Measures (e.g., Revetment, Retaining Structures, Rock Netting, Concrete Crib, Shotcrete, MSE Walls, Gabions, Riprap, Masonry)",
"sourceDataset": "DPWH contract list via BetterGov.ph",
"sha256": "3d69b1a6d927b9e5ad0037479e5aa5581e90e38ca2253f0cb4b19223613b785d"
}
}