Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CD0097

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CD0097","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG BOCAUE SANTA MARIA RIVER, STA. 02+200 STA. 02+350 (PHASE 2), BARANGAY UBIHAN, MEYCAUAYAN, BULACAN","Flood Control and Drainage","Completed",96499969.85,0,100,"Bulacan 2nd DEO","Region III","M3 KONSTRACT CORPORATION (FORMERLY:MARGARITA CONSTRUCTION) (20201)","2024-03-14","2025-02-20",2024,"Regular Infra - GAA 2024 OO-2",14.75753,120.91591,"301412000","301400000"]
SHA-256
558285389a2542538ec31cf68da39028d14aea4d5395bf4f336040a8762eea7d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.