Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CD0111

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CD0111","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG MARILAO RIVER AND ITS TRIBUTARIES TABON CREEK, STA. 04+925 STA. 05+125, BARANGAY NAGBALON, MARILAO, BULACAN","Flood Control and Drainage","Completed",57899912.04,0,100,"Bulacan 2nd DEO","Region III","JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)","2024-03-18","2024-09-25",2024,"Regular Infra - GAA 2024 OO-2",14.74875,120.94388,"301411000","301400000"]
SHA-256
48d0144995b0be19376df96682f8026156ee568c96aa7036ce157f56b7a8a1ed

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.