Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CD0115

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CD0115","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG ANGAT RIVER, BARANGAY POBLACION (CALUMPANG SECTION LEFT SIDE), NORZAGARAY, BULACAN","Flood Control and Drainage","Completed",43424968.82,0,100,"Bulacan 2nd DEO","Region III","JB CONSTRUCTION AND SUPPLY INC. (FORMERLY:JB CONSTRUCTION AND SUPPLY) (42531)","2024-03-11","2024-09-29",2024,"Regular Infra - GAA 2024 OO-2",14.9107,121.05053,"301413000","301400000"]
SHA-256
40ab7385792163b7d8d15cf3e73aad741aaa35cc9c9bef8875f3ea98126c3528

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.