Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CD0131

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CD0131","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG STA. MARIA RIVER, STA. 04+900 STA. 05+050 (POBLACION MACAIBAN SECTION), SANTA MARIA, BULACAN","Flood Control and Drainage","Completed",48998501.05,0,100,"Bulacan 2nd DEO","Region III","R.A. PAHATI CONST. & SUPPLY, INC. (35843)","2024-03-25","2024-07-09",2024,"Regular Infra - GAA 2024 SSP",14.81586,120.96071,"301423000","301400000"]
SHA-256
bc316d3a29058229d5d5ac8b0182228c7950e3ff220122fa9a6b5154ce18e22f

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.