Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CE0100

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CE0100","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABONG RIVER, BARANGAY CAINGIN TABING ILOG, GUIMBA, NUEVA ECIJA","Flood Control and Drainage","Completed",47767320.74,0,100,"Nueva Ecija 1st DEO","Region III","DGSARM BUILDERS INC. (FORMERLY: D.G. SARMENTA CONSTRUCTION) (13024)","2024-03-01","2024-09-26",2024,"Regular Infra - GAA 2024 OO-2",15.57637,120.76707,"304911000","304900000"]
SHA-256
e4f9eb5034adce6f882300da36e32250cec6c3274f5979e211ff89bd10107cef

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.