Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CE0128

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CE0128","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG LABONG RIVER, BARANGAY SAN CRISTOBAL, LICAB, NUEVA ECIJA","Flood Control and Drainage","Completed",24254959.8,0,100,"Nueva Ecija 1st DEO","Region III","AMP 723 CONSTRUCTION CORPORATION (FORMERLY: A.M.P. CONSTRUCTION) (16574)","2024-05-03","2024-08-21",2024,"Regular Infra - GAA 2024 OO-2",15.55601,120.75388,"304914000","304900000"]
SHA-256
5a4226105691052564f54ad45c58108252be194b7583b9a8e1509c951a31a9fd

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.