Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CE0295

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CE0295","CONCRETING OF BRGY. SAN PEDRO FMR, BRGY. SAN PEDRO, LUPAO, NUEVA ECIJA","Roads","Completed",14776454.02,0,100,"Nueva Ecija 1st DEO","Region III","IJK MAE CONSTRUCTION INC. (35272)","2024-05-24","2024-08-21",2024,"Outside Infra - GAA 2024 DA FMR",15.88042,120.87917,"304916000","304900000"]
SHA-256
5d6276c18498c743d53dcf130e5d088d36f98785613dc585c0f47c2bdb11c570

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.