Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CK0046

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CK0046","REHABILITATION OF EXISTING DIKE ALONG RIO CHICO RIVER, (MATAYUMTAYUM SECTION, RIGHT BANK), U/S OF RIO CHICO BRIDGE PHASE 2, STA. 14+837.48 TO STA. 15+278.69, LA PAZ, TARLAC","GAA 2024 OO-2","Terminated",67624419.87,0,100,"Tarlac 2nd DEO","Region III","AMETHYST HORIZON BUILDERS AND GEN. CONTRACTOR AND DEVELOPMENT CORP. ([REVOKED] 49129)","2024-05-07","2025-09-10",2024,"Regular Infra - GAA 2024 OO-2",15.51924,120.73666,"304914000","304900000"]
SHA-256
5259e87edda5d41bdfbc34c53d61c8cac32a4f6c2ba8713ab6ef61a84e4b0bd4

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.