Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24CM0077

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24CM0077","FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, IMPROVEMENT OF STO. TOMAS RIVER (STA. FE SECTION), SAN MARCELINO, ZAMBALES, PHASE 2","Flood Control and Drainage","Completed",192999998.6,0,100,"Zambales 2nd DEO","Region III","REPOLMAN CONSTRUCTION CORP. (FORMERLY: REPOLMAN CONSTRUCTION) (32842) / THREE W BUILDERS, INC. (10722)","2024-05-30","2024-11-24",2024,"Regular Infra - GAA 2024 OO-2",15.0136,120.21515,"307111000","307100000"]
SHA-256
b26bc4a869484e8efff6d1023dd9d02f3399cb00a46d2cb2c5278bbb80fdccab

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.