Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24DD0249

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24DD0249","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF SLOPE PROTECTION ALONG BALANGA-CATANDALA BRIDGE, IBAAN, BATANGAS","Flood Control and Drainage","On-Going",96042284.23,0,94.01,"Batangas 4th DEO","Region IV-A","JASMIG CONSTRUCTION CORPORATION (FORMERLY: JASMIG CONSTRUCTION SUPPLY) (26069)","2024-09-05",null,2024,"Regular Infra - GAA 2024 SSP",13.79415,121.14406,"401010000","401000000"]
SHA-256
65b7199f24f95f2debb7f6d5b0e7c00d95db5d1dbe1787862030ab719f8ec464

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.