Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24DE0073

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24DE0073","ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT SAN ROQUE TO SAN ANDRES, BAUAN,","Flood Control and Drainage","Completed",19300000,0,100,"Batangas 2nd DEO","Region IV-A","TRISTAN TEJADA CONSTRUCTION (FORMERLY: JOMATRIS CO (34387)","2024-03-05","2024-07-20",2024,"Regular Infra - GAA 2024 OO-2",13.79315,120.99357,"401006000","401000000"]
SHA-256
4e9f9f8118f5cb1788c13104d8e192c67cf66ce5118b85eb873abac0c6a171ba

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.