Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24DE0074

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24DE0074","CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF ROAD, PHASE 2, SITIO BAGONG POOK, BARANGAY MALABRIGO,","GAA 2024 SSP","Completed",4950000,0,100,"Batangas 2nd DEO","Region IV-A","GREENFIELD CONSTRUCTION CORPORATION (FORMERLY:GREENFIELD CONSTRUCTION) (31101)","2024-03-05","2024-06-05",2024,"Regular Infra - GAA 2024 SSP",13.59786,121.28164,"401015000","401000000"]
SHA-256
fb5bd9831ad57d5570a43835be31e410b01250f3c8453fd80ee524e66fbcf09c

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.