Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24DM0152

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24DM0152","CONSTRUCTION OF MULTI-PURPOSE FACILITY, LIWASANG ALFARO G. AGUIRE, MULANAY, QUEZON","GAA 2024 SSP","Completed",19800000,0,100,"Quezon 3rd DEO","Region IV-A","TM ABAD CONSTRUCTION CORP. (FOR: TM ABAD CONST.) (9302)","2024-07-04","2026-03-13",2024,"Regular Infra - GAA 2024 SSP",13.52163,122.40433,"405628000","405600000"]
SHA-256
aa12913ba5eb59166a100dc208419e06ea04b48c7908cc67a981f761609991f9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.