Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24DN0020

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24DN0020","CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD CONTROL STRUCTURE, SITIO UPPER KILINGAN PHASE 3, BARANGAY SAN JOSE ANTIPOLO CITY, RIZAL (SECOND DISTRICT)","Flood Control and Drainage","Completed",49000000,0,100,"Rizal 1st DEO","Region IV-A","LTDL BUILDERS (38371)","2024-02-14","2024-09-12",2024,"Regular Infra - GAA 2024 OO-2",14.62106,121.2903,"405802000","405800000"]
SHA-256
b6bc24e66ef39694167c49679369cb9a85ee7d0e44a5cc2fe805007e333b6ee1

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.