Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24EH0065

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24EH0065","CONSTRUCTION OF GABAWAN RIVER CONTROL ALONG BULWANG UPSTREAM(B/S) PHASE 3, ODIONGAN, ROMBLON","GAA 2024 OO-2","Completed",139925000,0,100,"Romblon DEO","MIMAROPA Region","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2024-03-13","2024-09-23",2024,"Regular Infra - GAA 2024 OO-2",12.41489,122.01543,"1705909000","1705900000"]
SHA-256
0155bf4e5df5a5b04c00b05ba73420469a75e86b14a6b38144b60b097136221d

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.