Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24EH0084

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24EH0084","CONSTRUCTION OF FLOOD CONTROL STRUCTURE ALONG DAVID BRIDGE UPSTREAM (L/S), ODIONGAN ROMBLON","GAA 2024 OO-2","Completed",125450000,0,100,"Romblon DEO","MIMAROPA Region","SUNWEST, INC. (FORMERLY: SUNWEST CONSTRUCTION & DEVELOPMENT CORPORATION) (15906)","2024-03-13","2024-11-15",2024,"Regular Infra - GAA 2024 OO-2",12.39984,122.0346,"1705909000","1705900000"]
SHA-256
3b9766a8e34a81300c2af8b7fa8c08e5e180ac6c0948712bb833d9537ab6a019

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.