Skip to content
FY2026 GAA: ₱6.79T
PisoScan

Project 24F00481

DPWH infrastructure contract
Hashed input (canonical JSON of the source row)
["dpwh","24F00481","CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD CONTROL STRUCTURE, BARANGAY MANDAZO, BASUD, CAMAR","Flood Control and Drainage","On-Going",234006094.76,0,88.54,"Region V","Region V","NEWBIG FOUR J CONSTRUCTION INC. (FORMERLY: FOUR J CONSTRUCTION) (15104)","2025-01-10",null,2024,"Outside Infra - Unprogrammed Appropriations 2024",14.04913,123.00682,"501601000","501600000"]
SHA-256
013e7a9be5de276b8ef8b30195d29f9e52f2e7b765f9c006dbad469d60c496e9

Hash the line above with SHA-256 to reproduce the fingerprint. It proves the record is unchanged since import. It is not a blockchain entry, and it cannot prove the source data is accurate.